Project

RAJI Factory

Location: Kirkuk , Iraq. Plot Area: 2,700 SQM. Client: Private. Submission Date: 2020. Scope of Work: SB-BE was responsible for performing the epoxy flooring works that include the following stages : • Floor grinding and cleaning. • Applying primer layer. • Broadcasting dried Silica sand . • Cleaning extra sand. • Applying epoxy first layer. • Applying epoxy second layer